City of York Council will be carrying out essential roadworks on key roads in York including, Cornlands Road, Bad Bargain Lane and Gale Lane, throughout October and November.
The council has worked with trade unions and its supply chain to enable the authority to develop new ways of working during the pandemic. This has ensured works on the highway can happen in a safe way for front line operatives and the public.
The contractor has permission from the local authority to undertake this essential work at this time.
The Council says that the following works are being undertaken:
Gale Lane
We will be carrying out road maintenance works at Gale Lane from 2 November for 5 days, weather permitting. Work will be carried out between 9am – 5pm working Monday to Friday only.
In order to carry out the work safely, the use of a full road closure from, but not including, the mini roundabout at Thanet Road up to the junction of St Stephens Road will be necessary whilst works are taking place.
We will also be carrying out kerbing and drainage works on 29th October for a period of 2 days working 9am – 4pm. These works will be carried out under local traffic management, will not affect access and the road will be open as normal. Parking will be suspended in sections to enable us to carry out the works.
All on-street parking will be suspended during the hours of the works for the full duration, but specific access requirements can be arranged by speaking to the site Traffic Management Operatives, who will coordinate with residents (and business requirements) around the ongoing work operations.
Cornlands Road
We will be carrying out road maintenance works at Cornlands Road from 26 October 2020 for a period of 3 days (weather permitting). The works will be carried out between 9am – 5pm.
In order to carry out the work safely, the use of a full road closure from, but not including, the mini roundabout at Gale Lane up to the junction of St Stephen’s Road will be necessary whilst works are taking place.
All on-street parking will be suspended during the hours of the works for the full duration, but specific access requirements can be arranged by speaking to the site Traffic Management Operatives, who will coordinate with residents (and business requirements) around the ongoing work operations.
Bad Bargain Lane
We will be carrying out road maintenance works at Bad Bargain Lane from 26 October. Work is expected to take 5 days, weather permitting. Work will be carried out between 9am – 5pm working Monday to Friday only. In order to carry out the work safely, the use of a full road closure from, but not including, the junction of Meadlands up to, and including, the junction of Burnholme Grove will be necessary whilst works are taking place.
All on-street parking will be suspended during the hours of the works for the full duration, but specific access requirements can be arranged by speaking to the site traffic management operatives, who will coordinate with residents and business requirements around the ongoing work operations.
Bus Service 11 will be diverted via East Parade straight on to Heworth Village, Hempland Lane, Stockton Lane, Algarth Rd and Ashley Park Rd.
We will also be carrying out kerbing and drainage works on 19 October for a period of 5 days working 9am – 4pm Monday to Friday only. These works will be carried out under local traffic management, will not affect access and the road will be open as normal. Parking will be suspended in sections to enable us to carry out the works.
Erection of single storey extension extending 6.00 metres beyond the rear wall of the original house, with a height to the eaves of 2.40 metres and a total height of 3.40 metres
Yorkshire Water have completed their water mains repair on Gale Lane which has now reopened to traffic.
Tudor Road is still closed and will be for at least another 2 weeks. Still no provision has been made for cyclists. No doubt if this was a street located in the City Centre such neglect would bring a chorus of disapproval!
The Council now no longer routinely consults neighbours by letter when an application is received
Bellhouse Way 5G Mast proposal
Although not yet a formal planning application, the Foxwood Residents Association have highlighted an informal consultation which is taking place on plans to install a 20 metre high 5G mobile phone mast next to the Community Centre on Bellhouse Way.
At 20 metres high the mast would dominate the surrounding area and be very visually intrusive. It is two and a half time higher than the existing mast.
The Residents Association have identified an alternative location, on the other side of the road, which would avoid the obstruction of the public footpath and which would also be better screened.
Somewhat later this year, the York Council has published its highways maintenance programme. The list reveals that the Council has cut its repairs budget by £100,000 compared to last year.
In total the Council will invest £12.3 million this year.
Not all will be spent on roads and paths as the budget also covers repairs to the City Walls (£626,000), replacement street lighting columns (£578,000) and drainage/gulley works (£1.7 million).
Most of the budget has been allocated to structural maintenance works.
£700,000 will be spent just filling in potholes as they appear.
The report gives no details of how the £500,000 repairs budget, delegated to wards last year, is being spent.
The details of the allocations – and which streets are affected – can be viewed via these links
School Street misses out on the resurfacing list again
The programme is likely to disappoint some residents. They may have hoped that the new Council would get to grips with the, now huge, backlog in highway resurfacing work needed in the City.
But it seems that many residential roads and paths will not get the attention that they need.
In the Westfield ward only two streets will be resurfaced. A second section of Gale Lane will be resurfaced as will the roundabout at the junction of Askham Lane and Ridgeway.
Badly worn footpaths like this on the odd numbered side of Askham Lane, in Walton Place, on Ridgeway, and on Otterwood Lane, together with the carriageways on Foxwood Lane and School Street, don’t get a mention.
Another hazardous road that didn’t make the cut
There is better news in Dringhouses with a large £1/2 million allocation is included for the resurfacing of Tadcaster Road while several streets in Woodthorpe* will be repaired. Work has already started on resurfacing part of Moor Lane.
The budget allocation predated the current health crisis. Like most of the Council’s expenditure commitments it is likely to be subject to review in the light of falling revenues.
Paradoxically, the current crisis has served to re-emphasise the importance of keeping basic highway surfaces in a condition which does not pose a threat to the safety of vulnerable users like pedestrians and cyclists.
We will be pressing for the details of the “ward resurfacing programme” to be released for scrutiny.
Streets identified for “micro patching” include; Lowick (£8,700), Troutbeck (£7,000), Woodthorpe School Entrance (£2,400), Overdale (£6,200), Glenridding (£15,000), Windermere (£6,200), Brambledene (£27,000), Dringfield Close (£6,500), Wains Road (£40,000), &
Lockwood Street (£6,000)