“Get a grip” call to local Councillors as footpath weed problem spreads

Residents have called on local Councillors to intervene to ensure that weeds growing on local paths and gutters are cleared. Today’s weather, damp and warm, is likely to see the problem get worse over the weekend.

Weeds are obstructing footpaths, gullies and garage areas in the Westfield Ward

In the little Green Lane garage area grass is now growing through the recently resurfaced forecourt. It is a similar situation in Windsor Garth

The weather also means that hedges will be growing more quickly. We’ve reported this bramble bush which is obstructing the public footpath near the entrance to Hob Moor school
Although the Council says that they have removed litter from the Tithe Close snicket, this doesn’t seem to be the case.
Similar situation on The Reeves snicket
The only thing that the Council seems to be doing quickly this summer is knocking down parts of west York. This is all that is now left of the Windsor House elderly persons home. There is some mud on local roads which needs to be monitored.
Still no sign of the replacement for the children’s games area at Hob Moor. Contractors using the old all weather games area for storage are at least polite!

More problems with hedges blockng footpaths

Pedestrians should take care when using the Tithe Close/Tedder Road snicket. A potentially hazardous thorn branch is overhang the path at eye height.
The Reeves snicket is also being obstructed. We’ve reported the increase in litter in the area.
Even more overgrown is the snicket link from Gale Lane to Bachelor Hill. More dumped rubbish also reported.
Although attractive, the roses on Dickson park also need trimming back from the footpath
Similar problems on Askham Lane
Potholes a problem for cyclists at the Dijon Avenue/Lowfield Drive junction
At the same location there is little evidence of weed treatment.

Latest planning applications for the Westfield Ward

 Below are the latest planning applications received by the York Council for the Westfield ward. 

Full details can be found by clicking the application reference 

—-

Former Lowfield School Dijon Avenue York

Condition 2 – 17/02429/OUTM

Self build code for 6 plots. Specifies maximum 12 months build period

Ref. No: AOD/19/00161 

——

Former Lowfield School Dijon Avenue York

Conditions 10, 13 & 37 of 17/02428/FULM 

Revised plans for boundary treatments, fencing, open space plan, highway works on Dijon Avenue,  highway works Tudor Road and similar details.  

Ref. No: AOD/19/00160 

—–

Windsor House 22 Ascot Way York YO24 4QZ

Conditions 16,19 & 21 of 18/01467/GRG3 

Relates to drainage plans.  Construction traffic management plan (Access via Ascot Way for delivery lorries using a one-way system! Worker car parking at Hob Moor school, bus stop moved temporarily along Ascot Way), replacement school playing pitches (at York R I)

Ref. No: AOD/19/00159 

——

17 Foxwood Lane York YO24 3LH

Fell Ash tree protected by Tree Preservation Order no. 3. 

Ref. No: 19/00907/TPO 

—–

15 The Reeves York YO24 3ES

Single storey rear extension. 

Ref. No: 19/00726/FUL 

——-

56 St Stephens Road York YO24 3EQ

Change of use from dwelling (use class C3) to a House in Multiple Occupation (use class C4). 

Ref. No: 19/00562/FUL |

——

Representations can be made in favour of, or in objection to, any application via the Planning on line web site.  http://planningaccess.york.gov.uk/online-applications/

NB. The Council now no longer routinely consults neighbours by letter when an application is received

York Council making good progress with re-roofing works at blocks of flats

The Council re-roofing contractors are making good progress on the blocks of flats in St Stephens Road area.The blocks in that road are scheduled to be completed by the end of June.

The programme will then  move into Thoresby Road and The Reeves with work there scheduled to finish at the end of July.

The programme will then move on to High Moor Road, Wains Road, Thanet Road and Dringfield Close before moving on towards the City centre. The programme is scheduled to be completed by the end of November.