Double yellow lines coming to a street near you?

The Foxwood Residents Association say on their Facebook site that they have responded to a notice placed on a lamppost which advertised plans for double yellow lines on Askham Croft.

They uncovered some maps (below) which give residents more details of what is planned in the Westfield Ward.

It may be that these plans are relatively uncontroversial.

However, it appears that dozens of other changes to parking restrictions affecting the whole City have also been tabled. We doubt whether local communities will read the lamppost notices in their areas and so may be unaware that they only have until the middle of May to register any observations.

We think that, as a minimum, the Council should alert residents to the proposals using their social media channels.

They should also publish a plain English version together with a map on their web site.

Click the graphic below to download a (not very user friendly) list.

Most often knocked over traffic bollard? Fastest growing thistles?

Is this the most frequently damaged mini roundabout keep left sign. Located at the junction of Askham Lane and Ridgeway, no sooner is it repaired and another large vehicle – or careless driver- knocks it over again. York Council needs to come up with a better solution.
Thistles are now partly blocking the cycle path at Knapton. Not sure whether this is on the York Council weed killing programme? It should be. It would be a shame to lose this, increasingly well used, cycle link to Rufforth for lack of maintenance.
It would be a shame if the York Council was to be allowed to continue to neglect the Front Street area. More must be invested in improving maintenance standards. However, there are now new opportunities for regeneration. The Councils decision to (effectively) evict disabled drivers (blue badge holders) from the City centre could prompt the reopening of Front Street, for this category of motorists, on at least a couple of days each week. They would then be free to park nearer the shops (disabled parking spaces are currently limited). Cyclists would also benefit. “Social distancing” is made easier because of the shop forecourts. Add in some music/entertainment, street stalls and a high profile marketing campaign and the area could soon be buzzing again. .

Latest planning applications for the Westfield Ward

 Below are the latest planning applications received by the York Council for the Westfield ward.

Full details can be found by clicking the application reference

—-

11 Barkston Avenue York YO26 5DH

Two storey side and single storey rear extension following demolition of side projection

Ref. No: 20/01039/FUL 

—-

H2o Bathrooms And Kitchens Ltd 51 York Road Acomb York YO24 4LN

Conversion of upper floors (use class A1) to form 3no. one bedroom flats with rooflights, dormer extension and alterations to fenestration

Ref. No: 20/01038/FUL 

—–

49 Ridgeway York YO26 5DA

Single storey front, side and rear extension

Ref. No: 20/00938/FUL 

——

Representations can be made in favour of, or in objection to, any application via the Planning online web site.  http://planningaccess.york.gov.uk/online-applications/

The Council now no longer routinely consults neighbours by letter when an application is received

Issues in west York reported – paths, flooding and verge damage

Latest planning applications for the Westfield Ward

 Below are the latest planning applications received by the York Council for the Westfield ward. 

Full details can be found by clicking the application reference 

—-

Rivington House 3 Ridgeway York YO26 5DA

Single storey side extension to extend existing garage to front 

Ref. No: 19/02086/FUL 

——

24 Kir Crescent York YO24 3DF

Conditions 3 and 6 of 17/01440/FUL 

Ref. No: AOD/19/00335 

——-

Hop And Glory Ltd 43 Front Street York YO24 3BR

Change of use of retail unit (Use Class A1) to cafe (Use Class A3) with associated works 

Ref. No: 19/02075/FUL 

Hop and Glory to become cafe

——-

63 Beaconsfield Street York YO24 4NB

Erection of single storey extension extending 4.464 metres beyond the rear wall of the original house, with a height to the eaves of 2.5 metres and a total height of 3.5 metres. 

Ref. No: 19/01707/LHE 

——

Former Lowfield School Dijon Avenue York

Conditions 4, 15, 17, 18, 22 and 29 of 17/02428/FULM 

Ref. No: AOD/19/00334 

These applications refer mainly to Health and Safety plans. In addition they indicate the phasing of the development, location of site compound/car parking and proposed access routes. (see drawings below)

Access routes

——–

Representations can be made in favour of, or in objection to, any application via the Planning on line web site.  http://planningaccess.york.gov.uk/online-applications/

NB. The Council now no longer routinely consults neighbours by letter when an application is received

Westfield residents petition for better roads and footpaths

Local LibDem Councillor Sue Hunter will present 4 petitions to the York Council meeting on Thursday.

They cover the following issues raised by residents.

Speed humps on Askham Lane need repairs

(i)      regarding the following improvements prior to any further building work starting in the Hob Moor area:

  • Improving the access along Kingsway West/Ascot Way, removing  where necessary, the grass verge
  • Providing dropped kerbs of lay-by parking where this doesn’t already exist
  • Providing alternative, modern, children’s play facilities before any existing provision is removed

(ii)      regarding having roads and footpaths in the Ridgeway area repaired and, where necessary, resurfaced and that  grass verges be “edged” and hedges trimmed back so that the original widths of footpaths are restored.

(iii)     regarding having roads and footpaths (including speed cushions) at the low numbered end of Askham Lane repaired and that grass verges be “edged” and that hedges/trees are trimmed back so  that the original  width of the  footpath is restored.

(iv)    calling on Talk Talk to repair the footpaths and verges that they have damaged during their works

Petitions presented at full Council meetings are normally referred for an officer report to be prepared. They are then considered by a Council committee.

Acomb busy today. Council gives start date for Askham Lane footpath repairs

Acomb car park very busy today. Market and Christmas Fair taking place on Front Street

Acomb market today (Saturday). Lots of stalls and already very busy.

The Council has announced that it will start footpath resurfacing works on Askham Lane near the junction with Ridgeway on 10th December.

The TalkTalk UFO contractors have been undertaking reinstatement work in the Ridgeway area this week. Pressure is growing for a more thorough refurbishment of paths and verges. Some verges badly need edging but the Council are being very coy about what they will do and when

Hanging gardens hit by earthquake as LibDems step up local action in Westfield

The hBabylon 2anging gardens of Foxwood Lane are no more as a team, led by Andrew Waller, has removed the weeds growing out of the bus shelter gutters.

Elsewhere local LibDem Councillors have been out and about identifying and reporting other public services in need of improvement.

Action update 25th May 2015