Better Parliament Street cycle parking info from Council

…..but two months too late and what happened to consultation?

The following information has been provided by the Council in response to complaints about lack of consultation about the removal of cycle parking from Parliament Street. It would have been better if the information had been published a couple of months ago rather than the day after the racks disappeared!!

“The old individual cycle racks are being removed this week and will be replaced with ones on rails. Any bikes which have been left locked to a rack will be removed to the Council’s secure store.

What is happening? – The old individual cycle racks are being replaced with ones on rails where the racks are spaced wider apart that the current ones (1200mm as opposed to 800mm).  As construction of the cabins for the Christmas Market will start later this week (02/12/19) the new racks will be temporarily relocated to the following locations:

  • Davygate – outside Debenhams
  • Davygate – outside the former French Connection shop
  • Davygate – outside the former Halifax Bank
  • Church Street – at the side of St Sampson’s Church
  • Church Street – outside The Works
  • St Andrewgate – at the Kings Square end
  • Piccadilly – outside Lloyds Bank
  • Parliament Street – outside Barclays Bank
  • Walkway at the rear of All Saints Church
  • Lendal as soon as the skips associated with the Guildhall works are removed

When are the old racks being removed? – The racks are being removed on the 29th October.  Notices were placed on the affected racks a week in advance to forewarn users of their imminent removal.  Any cycles which have been left locked to a rack will be removed to the Council’s secure store.  Anyone wishing to reclaim a cycle should contact network.management@york.gov.uk to arrange collection.

Why is this work being done? – Following last year’s Christmas Market concerns were raised by the city centre safety advisory group about the relatively few accesses / exits from the central area and the narrowness of these accesses.  In order to enable the cabins to be better laid out and to increase the number and width of the accesses / exits it has been agreed that the cycle parking will be temporarily removed for the duration of the large events which take place on Parliament Street including the Christmas Market and Food & Drink Festival. 

The racks will be relocated to the above locations during the event and then reinstalled on Parliament Street as soon as possible after the event. At this stage it is not envisaged that the cycle parking will need to be relocated during the Yorkshire Fringe Festival or smaller markets.  In previous years several of the racks were unavailable during large events because cabins or marquees were installed immediately next to them therefore cycle parking capacity was reduced. 

By relocating the racks elsewhere in the city centre there should be no net loss of capacity during these busy events.

Self build plots on market at Lowfields

The UK’s first-ever council-led development of custom-build plots with some specifically designated for first time buyers, will welcome bids from buyers from 1 November.

The six custom-build plots are part of a larger mixed-use development of 140 new homes at Lowfield Green by City of York Council.

The development is controversial as it has seen a valued green open space – used for sporting activities – built on. Residents – who formed their own action group to oppose the plans – are also concerned about delays in the overall development timetable.

Two of the plots have been restricted for first time buyers only, as they offer a more affordable option, and are designed to help people on to the property ladder. This supports the council’s pledge to offer a breadth of options to a range of lower-income households and is in addition to shared ownership of homes from the open market as well as council-owned homes. 40% of all the homes at Lowfield Green will be affordable and Homes England helped fund work done to prepare the site for development.

Idealised image of self build homes

Custom-build plots are serviced with all required utilities – electricity, water and telephone cable – as well as with road access to enable buyers to get on site. With outline planning permission already secured, construction can begin immediately after detailed planning has been granted.

All plots are large enough for a detached home of between three and five bedrooms with an integrated garage if needed. They also benefit from south-facing back gardens and uninterrupted views of the new village green to the front. This former secondary school site has been sensitively master planned around a new green open space to contribute towards creating an attractive new place to live in the city.

To support this innovative self-build project, City of York Council has engaged Custom Build Homes – the UK’s leading enabler of custom build housing – to deliver aspects of the development process including; consultancy, pre-agreed mortgage lending as well as leading the sales and marketing for the site.

Bidding for all 6 plots opens on 1 November and all bids need to be in for 29 November. Prospective purchasers will have the opportunity to view the plots, with the first viewings to be arranged by appointment only, on the morning of Saturday 9 November. All bids will be assessed and, if no suitable applications have been received by first time buyers, the allocated plots may be offered to other applicants. More detail is available by visiting lowfieldgreen.custombuildhomes.co.uk

All serviced plots can be seen and bid for at lowfieldgreen.custombuildhomes.co.uk or email lowfieldgreen@custombuildhomes.co.uk for more information.

Extra winter beds opening for rough sleepers in York

People sleeping rough in York can safely bed down this winter as extra emergency beds are being offered again, whatever the weather, from 1 November 2019 until 28 February 2020.

Besides securing nearly £400,000 extra fund for additional outreach workers to give rough more intensive support especially around mental health, York goes above and beyond the national ‘severe weather scheme’. Regardless of whether it’s freezing or not, we make extra emergency beds available bringing the total up to 29 in the winter months: that’s 20 more beds than our current official number of nine rough sleepers in the city.

Five of the emergency beds have been created at a council hostel and are being supported by volunteers from the YES Below Zero scheme. Last year this provision supported 18 rough sleepers into private rented accommodation.

Also in 2018-19, the council resettled 58 former rough sleepers or single homeless people into permanent tenancies, and accommodated 66 households during a period of homelessness.

People leaving sleeping on the streets are placed in the city’s 101-bed supported accommodation schemes. Their dogs can also be brought into emergency accommodation as has been the case in York since 2000.

The people are offered support and education to help address any of the issues that may have contributed to them becoming homeless. This includes referral to services for mental health or substance misuse, and training for work and how to manage a lasting tenancy.

Once that stage is successfully underway, they are allocated space in the city’s 90 independent accommodation units before, hopefully, supporting them into either private or affordable fully-independent homes.

Councillor Denise Craghill, executive member for housing and safer neighbourhoods, said: “Rough sleeping has increased by 132% nationally since 2010 with only a small decrease of 6% nationally during 2018-19. We have secured nearly £400,000 funding for 2019/20 to explore new ways to prevent it, as sleeping on the street lowers life expectancy to 47 years.

“With our partners The Salvation Army, Changing Lives, Peasholme Charity, Restore, YES Below Zero, Carecent and KEY, we continue to offer all known people sleeping rough help to get off the street and into safer, more stable lifestyle, including extra support for people with mental health and substance misuse issues.

“Help is routinely offered to rough sleepers on the early morning walks undertaken several times a week when everyone is offered a bed.”

Charles Walters, of the YES Below Zero team, said: “We are looking forward to building on the solid start YES Below Zero made over the 2018/2019 winter season. The team of volunteers was encouraged by the significant number of positive outcomes.

“As we gear up to help contribute capacity to the emergency bed provision for this next winter season, we invite those who are interested in volunteering to contact us on atbarnett33@gmail.com.

  • To alert support services to a rough sleeper, please ring Street Link on 0300 500 0914.
  • Or, please join us encouraging people sleeping rough to go to The Salvation Army’s early intervention and prevention hub at 63 Lawrence Street, York YO10 3BU between 10am and 12 noon when they’ll be given support.
  • At night or the weekend, rough sleepers can call 01609 780780 for help.
  • To find out ways to donate and support people out of homelessness, please visit www.york.gov.uk/roughsleeping

Good time to secure your recycling

The Council said yesterday (Tuesday) that it had failed to collect recycling from Tedder Road and Slessor Road. They blamed a vehicle breakdown.

Notice on Council web site Tuesday 29th October 2019

The Council says that they will call back to collect the recycling on SATURDAY.

We suspect that message may have not got back to residents. Most have left their recycling on the street. Normally this might not matter – if it was secured from wind and animal attacks – but with the arrival of “Mischief Night” we think residents would be wise to put the recycling in a secure place.

Recycling awaiting collection

Often the Council says that it will catch up with collections on the next working day; but not in this case. This is confusing for residents.

It does raise several questions about how effective the Councils communications channels are. Failings in the waste collection service this summer have been so frequent it almost requires a daily update from them using all social media channels.

The Council might also issue regular updates indicating when more reliable vehicles, with adequate capacity, will be delivered.

Missed bin updates are posted on this link (click) at around 5:00pm each day

We’ve reported the overgrowing thorn bush which is obstructing the entrance to the Chesney Field cycle track