5,819 York children to benefit from LibDem project
Local Liberal Democrats have welcomed the news that in total 5,819 children in York will benefit from the introduction of universal Free School Meals when term begins next week.
All reception, year 1 and year 2 pupils will now get their meals paid for under the scheme, which was first announced by the Liberal Democrats in 2013.
Although some children previously qualified for school meals, some do not take them due to the stigma, and others who don’t qualify struggle to afford them.
Research and pilot schemes in places such as Durham and Wolverhampton show that introducing universal free school meals leads to positive improvements in health, attainment and social cohesion, as well as helping families with the cost of living.
York Green Belt showdown meeting date set for 18th September
The meeting to discuss possible changes to Labours highly controversial Local Plan proposals will take place on Thursday 18th September at 5.30pm at West Offices.
This will be the first opportunity that residents will have to personally confront the Labour Councillors who are responsible for the plan which could see 22,000 additional homes built in the City – mostly on land currently defined as “Green Belt”
The Labour plan would see the city increase in size by 25% over the next 15 years with potentially dramatic effects on transport, health, education and other public services in the City.
The papers for the meeting will be published on 10th September on the Councils web site.
Any approved changes – and there will have to be some as new brownfield sites for over 1600 homes have been identified since the draft plan was published in April 2013 – will apparently be reported to a “Cabinet” meeting on 25th September.
Given that there were over 15,000 objections to the Councils plan, giving residents only 8 days to read and analyse the official response is insulting to residents.
Amongst the original plans were proposals to build on Acomb Moor (opposite Foresters Walk) and land opposite Woodthorpe/Acomb Park on Moor Lane.
Proposals to build a “Showman’s Yard” on land between Wetherby Road and Knapton were subsequently withdrawn by the land owners, although the Councils enthusiasm for the scheme means that the Green Belt designation of the site is still under threat.
Labour are hoping to rush their plans through before they lose power in next years local Council elections. However a protracted Public Inquiry (Examination in Public) now seems inevitable.
Residents who wish to speak at either of the meetings (18th and/or 25th) must register to do so at least a day before the meeting.
Newbury Avenue development – new layout proposed. Contamination and drainage concerns
A new layout plan for the controversial 9 flat development on the garage area off Newbury Avenue has been published.
It is unlikely that many residents will have seen the plan as objectors have not been alerted to the changes.
The new layout increases the number of parking spaces to be provided to 16 with an additional 5 to be located on vacant land at the Newbury Drive/Windsor Garth junction.
This is the junction which is subject to ponding after heavy rain.
Unfortunately at the same time the Council has said that it won’t be acting quickly to deal with the lack of proper parking opposite Carlton House. Vehicles parking on the bend have caused the bus to mount the footpath on several occasions. It had been hoped that individual driveways for the house would have been provided across the green area with more parking for residents being constructed to the rear of the flats.
There is no news on where the occupants of the garages will park in future. It had been suggested that the Council should provide dropped kerbs/verge crossovers where the 24 garage occupants wanted to construct an alternative parking space in their gardens. This idea has not yet been taken forward.
The background papers for the development can be accessed by clicking here
The 3 storey buildings will prove eight 2 bedroomed flats and one single bedroomed unit. Access to each will be by an external walkway.
There are some big questions on drainage arrangements which are yet to be satisfactorily answered.
A report from the Councils protection unit concluded “Therefore, there is a plausible possibility that residual contaminants may be present onsite”. This arises from its former use as a waste disposal site in the 1950’s.
In a later objection the Unit expresses concern about methane gas levels in the area and says,
“The soil sampling results identified elevated levels of lead, PAHs, arsenic and vanadium. Remedial work is therefore required, in order to ensure that the site is safe and suitable for its proposed use, and a remediation scheme must be submitted for our approval in due course”.
The ground conditions mean that piling will be required in the construction process.
It is expected that the application will be determined at a meeting which is scheduled to take place on 8th October.