Resurfacing works on Hawthorn Grove and Mill Lane in Heworth

City of York Council will carry out resurfacing works on Hawthorn Grove and Mill Lane between Monday 16 and Friday 27 September.

The works on Hawthorne Grove will take place between Monday 16 to Friday 20 September, between 7.30pm and 5am.

This will require a road closure from, and including, the mini-roundabout at Harcourt Street up to, but not including, the Eboracum Way junction. Mill Lane will also be closed but residents’ access will be maintained via Heworth Green.

The works on Mill Lane will be carried out between Monday 23 and Friday 27 September between 8am and 5pm. There will be a road closure from Heworth Green up to, but not including, the mini-roundabout at Harcourt Street.

The works will consist of resurfacing the road and the reinstatement of all road markings. In order to carry out these works safely the use of temporary road closures will be necessary whilst works are taking place. A clearly signed diversion route will be set out for all traffic.

All on street parking will be suspended at these times but any specific access requirements may be arranged by speaking to the site traffic management operativesm who will co-ordinate with residents and business requirements around ongoing construction operations.

Any vehicle remaining on the street during the suspension time may be liable to a parking fine and removal costs.

Household waste and recycling collections will take place as normal. For Mill Lane, residents are asked to ensure bins are placed on the kerbside by 7am on the day of collection.

During the closure of Hawthorn Grove, bus service 6 will be diverted via Eboracum Way, Heworth Green, Heworth Road, and Melrosegate (not serving Fifth Ave or Fourth Ave). Coastliner will be diverted via Eboracum Way, Heworth Green (not serving East Parade or Heworth Road).

In addition to the above, the council will be carrying out kerbing and drainage works between Monday 9 and 13 September on Hawthorn Grove working 9.15am – 4pm and also on Mill Lane on Monday 16 to Saturday 21 September working 9.15am – 4pm.

During these works the road will be open as normal to travel through, but all on street parking will need to be suspended during these times.

Emergency services will be permitted through the works at all times. Cyclists will have to dismount and use the footways.

As with any construction work, there is likely to be a certain amount of disruption and inconvenience to the public, however the council will try at all times to keep any disruption to a minimum.

For more information about roadworks in York visit: www.york.gov.uk/roadworks