Cycle paths still obstructed

Mixed news about getting local paths cleared of overgrowth

Tadcaster Road cycle path blockages
See the source image

Meanwhile the York Council is now claiming that they are not responsible for keeping the cycle track, which is located next to the slip road from the A64, clear of obstructions. The Council did actually cleared similar problems this time last year.

We will be very disappointed if this turns out to be a jurisdiction stand off between the York Council and Highway Yorkshire. The latter is responsible for maintaining the cycle path along the side of the trunk road.

Coronavirus York updates; 11th July 2021

Test results

111 additional positive test results today, Brings the cumulative total up to 15,126.

The number of cases in the City has increased from 834 to 854

The rate /100k population has edged back up to 405.49 today. Overall numbers remain high, but they are no longer trending upwards.

Neighbourhoods

Vaccinations

1682 vaccinations were completed yesterday (Saturday)

Tests

  • 8169 PCR tests were completed during the week ending 6th July 2021
  • Of these, 10.4% were positive. That represents an increase on the previous recorded figure of 10.2%.
  • In addition, 1606 “lateral flow” tests were also completed on 10th July.

“Grab a Jab”

In parts of the Westfield Ward in York, 1 in 5 eligible adults haven’t yet had even their first dose of coronavirus vaccine.
Nearly half those eligible haven’t had their second dose.
Anyone can now get a second vaccination if they had the first jab 8 weeks or longer ago.

It couldn’t be easier or quicker to get a free jab.

Please take a few minutes to pop down to Askham Bar (next to Tesco on Tadcaster Road) or to one of the many local surgery and pharmacy sites which are advertising the service each day